Phase I Environmental Site Assessment in Miami
A Phase I Environmental Site Assessment in Miami-Dade County has to account for two regulators, not one: the Florida Department of Environmental Protection and Miami-Dade County’s Department of Environmental Resources Management (DERM), which runs its own permitting, inspection, and enforcement program. MORAN ROCKS LLC performs Phase I ESAs across Miami-Dade County to ASTM E1527-21 and EPA All Appropriate Inquiries standards, prepared by a Florida Licensed Professional Geologist with direct Miami-Dade field experience, including petroleum site assessment and FDEP Petroleum Restoration Program reporting.
Why Miami properties need local Phase I work
- A sole-source aquifer underfoot. Miami-Dade sits on the Biscayne Aquifer, a federally designated sole-source aquifer. The water table is often within one to three feet of the surface in the wet season, and the aquifer moves contaminants quickly and over distance. Surface releases that would be minor elsewhere carry elevated risk here.
- Dense legacy industry. The Hialeah and Medley industrial corridors hold some of the highest densities of petroleum storage tank sites and auto salvage yards in South Florida. The Miami River industrial district, the airport area, and older commercial corridors carry documented histories of fueling, solvent, and dry cleaning releases.
- Agricultural legacies in the south county. Decades of farming in the Redlands, Homestead, and Florida City leave pesticide, herbicide, and fertilizer signatures in soil and groundwater.
- DERM sees it too. County review can reach a different conclusion than a report does — a Phase I that closes a finding a lender accepts may still draw DERM scrutiny. Our reports are written with both audiences in mind. (See: what happens when DERM disagrees with a Phase I’s no-REC conclusion.)
What the assessment includes
- Federal, state, county, and DERM records review for the property and surrounding sites
- Historical research: aerials, fire insurance maps, city directories, prior reports
- Site inspection, including adjoining properties and uses
- Interviews with owners, occupants, and officials where available
- A report stating plainly whether Recognized Environmental Conditions were identified and what should happen next
Where a Phase I identifies a concern, a Phase II ESA adds soil and groundwater sampling to confirm whether contamination is present and how far it extends.
Turnaround
Standard Phase I ESAs are completed in 2 to 3 weeks, with rush service available. For an immediate price range, use the instant Phase I estimate tool on our homepage, or call (786) 263-9185 — most quotes are provided within one business day.
Who uses our Miami Phase I reports
Commercial buyers and sellers, lenders assessing collateral risk, attorneys and title companies on contaminated-property closings, and developers working through county and state permitting. You work directly with Nicholas Moran, PG.
Start here: Call (786) 263-9185, or get a price range now with the instant estimate tool on moran.rocks.
FAQs
How much does a Phase I ESA cost in Miami?
It depends on property size, location, history, and turnaround. Use the instant estimate tool on our homepage for a range, or call for a site-specific quote.
Does Miami-Dade require anything beyond a standard Phase I?
The Phase I itself follows ASTM E1527-21. What differs is the review environment: DERM maintains its own records and enforcement program, so a thorough county-records review matters here more than in most Florida counties.
What if the Phase I finds a Recognized Environmental Condition?
The usual next step is a Phase II ESA — soil and groundwater testing to confirm the presence and extent of contamination, which then informs pricing, negotiation, or cleanup planning.
Related: Phase I Environmental Site Assessment, environmental consulting in Miami-Dade County, Phase I ESA cost guide.